Climate Requirements of Composite Geomembrane Materials for Construction Synthesis

During the construction process, the climatic conditions should meet the requirements of composite geomembrane construction. Pay attention to these details during construction. If you encounter strong winds or rainy days above level 4, construction should generally not be carried out.

Generally, the temperature should be between 50 and 40 degrees Celsius. In windy weather, the wind will affect the construction. At low temperatures, the geomembrane should be tensioned and pressed firmly with sand bags. At high temperatures, the membrane should be relaxed. Laying HDPE In front of the geomembrane, the corresponding qualified acceptance certificate of the civil engineering should be provided. Usually in corners and deformed sections, walking on the membrane surface, moving tools, etc. should be minimized, and the seam length should be minimized.

It is necessary to avoid the aging phenomenon of the geomembrane as much as possible, and artificial wrinkles should be avoided. Any object that can cause harm to the composite geomembrane should not be placed on the membrane or carried on the membrane without welds as much as possible. When the temperature is low, it should be tightened and paved as much as possible. The subgrade is based on the actual ground and geological conditions during construction. Only in this way can we save costs and improve construction efficiency.

Composite Geomembrane

The main factors affecting the aging of composite geomembrane are solar ultraviolet radiation and solar ultraviolet light energy. It is difficult to avoid contact with light, heat and oxygen during storage, transportation, construction and use. Used in a variety of harsh geological and climatic conditions. It is a good anti-corrosion material that can resist the corrosion of strong acids, alkalis and oils, and has strong strain ability to adapt to uneven geological settlement.

Although some high and low objects are prevented from being listed on the ground. And ensure that the membrane and the composite geomembrane and the membrane and the base surface should be flattened and tightly attached. It is also suitable for some large-scale workshop construction site water conservancy project stones or other sharp goods. When backfilling protective layer and masonry protective face, you should also pay attention to handling it carefully. By HDPE Impermeable membrane 10 cm The thick protective layer of soil must be sieved and slightly loosened. It should be noted that the area of laying film at one time is too difficult to be poor.

The main function of composite geomembrane is to hope that these items can be better fermented into raw materials. There is enough guarantee to really do the whole project better and make sure that it is used more reasonably. Many engineering construction and garbage disposal are not simply burying and covering. Pond excavation needs to be used. Geomembrane manufacturers can prevent infiltration and prevent leakage and exposure.

 


Post time: May-15-2025