Artificial lake anti-seepage membrane is generally used as an anti-seepage tool in artificial lake construction projects. With the continuous upgrading of product technology, artificial lake anti-seepage membrane has also been widely used in water storage regulation. Although the quality of the application process of reservoir is lower than that of artificial lake, the requirements are indeed very strict during construction, which also has a certain impact on the construction environment. Today, we will introduce to you the precautions in the use of artificial lake anti-seepage membrane in water storage regulation.
Using artificial lake water storage and regulation pond can not only accumulate rainwater in flood season, but also make particles in rainwater settle largely, and then discharge them into rivers after a period of time, which can play a good role in water body regulation. Usually, reservoirs are built according to the place and time, and most of them are built artificially. In order to prevent the infiltration of water resources, anti-seepage membranes will be laid to achieve the effect of water storage.
During the construction of artificial lake anti-seepage membrane, the main issue that we need to consider is the construction of the lower drainage ditch. When completing the lower drainage ditch of the reservoir, the flatness of the bottom of the pool should be handled well. Because the bottom area of the pool is large, there are inevitably omissions. However, it is necessary to ensure that there are no sharp protrusions to prevent certain damage to the materials. After the tamping and leveling operation, the flatness of the lower drainage ditch should be considered at the same time.
Another problem is that during the treatment of the slope of the reservoir, we must pay attention to the anti-slip problem of the anti-seepage membrane of the artificial lake. During the excavation of the anchorage ditch and the concrete construction of the transition layer, we can design the specific construction project and communicate with the management. After planning and communicating with the personnel, the next step of construction will be carried out. Every time the operation is completed, it must be accepted in time to confirm that the construction result is qualified before the next operation can be carried out!
Post time: May-22-2025